2022 Work Plan
The principal Phase 1 Construction tasks for Summer 2022 are:
- Pour full-perimeter concrete frost walls.
- Pour concrete foundations and pads for columns.
- Install steel structural columns and beams.
If sufficient funds are available, work on the dome and the roof could also begin in 2022.