2022 Work Plan

The principal Phase 1 Construction tasks for Summer 2022 are:

  • Pour full-perimeter concrete frost walls.
  • Pour concrete foundations and pads for columns.
  • Install steel structural columns and beams.

If sufficient funds are available, work on the dome and the roof could also begin in 2022.